Mining Project Value Optimization - You, Greg Guanlin; - Prospero Internet Bookshop

Mining Project Value Optimization
 
Product details:

ISBN13:9789819778829
ISBN10:9819778824
Binding:Hardback
No. of pages:194 pages
Size:235x155 mm
Language:English
Illustrations: 18 Illustrations, black & white; 21 Illustrations, color
692
Category:

Mining Project Value Optimization

 
Edition number: 2024
Publisher: Springer
Date of Publication:
Number of Volumes: 1 pieces, Book
 
Normal price:

Publisher's listprice:
EUR 85.59
Estimated price in HUF:
37 205 HUF (35 434 HUF + 5% VAT)
Why estimated?
 
Your price:

29 765 (28 347 HUF + 5% VAT )
discount is: 20% (approx 7 441 HUF off)
Discount is valid until: 31 December 2024
The discount is only available for 'Alert of Favourite Topics' newsletter recipients.
Click here to subscribe.
 
Availability:

Estimated delivery time: In stock at the publisher, but not at Prospero's office. Delivery time approx. 3-5 weeks.
Not in stock at Prospero.
Can't you provide more accurate information?
 
  Piece(s)

 
Short description:

This book provides a holistic approach of integrated mine planning and scheduling to optimize mining projects using the discounted cash flow rate of return (DCF-ROR) method. There are nine chapters in the book. Chapter 1 is the Introduction, which provides overviews of mineral assets, minerals in Australia, mineral exploration, mining methods, and significance of valuation, optimization, and integrated mine planning. Chapter 2 is the Mineral Resources and Ore Reserves Estimation, including grade composition method, inverse distance weighting method, ordinary Kriging method and block model.  Chapter 3 is the Feasibility Study that delves into three phased feasibility study, namely scoping, prefeasibility and feasibility studies, data requirements, risk identification and mitigation in the feasibility study, and mining project cost estimation. Chapter 4 is the Valuation of Mineral Projects. It starts with the time value of money; followed by methods to calculate cash flow, discounted cash flow (DCF), net present value (NPV), internal rate of return (IRR) and payback period; valuation methods, including market-, income-, and cost-based approaches; and finally the sensitivity study of key factors influencing the valuation of mining projects. Chapter 5 is the Mine Planning and Open Pit Optimization that covers different types of mine planning, block model valuation, Lerchs-Grossmann and floating cone techniques for pit optimization. Chapter 6 is the Life of Mine Optimization that details a case study of strip mining optimization using the DCF-ROR method and integrated LOM optimization of open pit mining. Chapter 7 is the Production Schedule Optimization of Surface Mining, covering production schedule optimization, equipment availability and utilization, and loading and hauling equipment match optimization. Chapter 8 is the Optimization of Underground Mine Planning and Scheduling that delves to a case study of room and pillar mining optimization using the DCF-ROR method and mathematical programs for underground stope layout and production schedule optimization. Chapter 9 is the Conclusion of the book.



The book can benefit students and professionals in multiple ways.  Firstly, divisions and confusions may arise from different contexts of technical frameworks, taxation, and relevant legislations in literature. Having quality contents in one book will improve the efficiency of study. Secondly, the inclusion of plentiful hands-on examples and calculation tables underscores the practical application of the concepts, bridging the gap between theoretical knowledge and real-world scenarios. Thirdly, the book adopts an integrated approach to evaluate and optimize mineral projects, utilizing methodologies such as DCF-ROR for optimization, ordinary Kriging for ore reserve estimation, and multi-level optimization including strategic planning, pit optimization, life of mine optimization, and production schedule optimization. Finally, the content is fully aligned with internationally recognized standards such as the VALMIN and JORC codes, ensuring compliance with industry best practices and guidelines.

Long description:

This book provides a holistic approach of integrated mine planning and scheduling to optimize mining projects using the discounted cash flow rate of return (DCF-ROR) method. There are nine chapters in the book. Chapter 1 is the Introduction, which provides overviews of mineral assets, minerals in Australia, mineral exploration, mining methods, and significance of valuation, optimization, and integrated mine planning. Chapter 2 is the Mineral Resources and Ore Reserves Estimation, including grade composition method, inverse distance weighting method, ordinary Kriging method and block model.  Chapter 3 is the Feasibility Study that delves into three phased feasibility study, namely scoping, prefeasibility and feasibility studies, data requirements, risk identification and mitigation in the feasibility study, and mining project cost estimation. Chapter 4 is the Valuation of Mineral Projects. It starts with the time value of money; followed by methods to calculate cash flow, discounted cash flow (DCF), net present value (NPV), internal rate of return (IRR) and payback period; valuation methods, including market-, income-, and cost-based approaches; and finally the sensitivity study of key factors influencing the valuation of mining projects. Chapter 5 is the Mine Planning and Open Pit Optimization that covers different types of mine planning, block model valuation, Lerchs-Grossmann and floating cone techniques for pit optimization. Chapter 6 is the Life of Mine Optimization that details a case study of strip mining optimization using the DCF-ROR method and integrated LOM optimization of open pit mining. Chapter 7 is the Production Schedule Optimization of Surface Mining, covering production schedule optimization, equipment availability and utilization, and loading and hauling equipment match optimization. Chapter 8 is the Optimization of Underground Mine Planning and Scheduling that delves to a case study of room and pillar mining optimization using the DCF-ROR method and mathematical programs for underground stope layout and production schedule optimization. Chapter 9 is the Conclusion of the book.



The book can benefit students and professionals in multiple ways.  Firstly, divisions and confusions may arise from different contexts of technical frameworks, taxation, and relevant legislations in literature. Having quality contents in one book will improve the efficiency of study. Secondly, the inclusion of plentiful hands-on examples and calculation tables underscores the practical application of the concepts, bridging the gap between theoretical knowledge and real-world scenarios. Thirdly, the book adopts an integrated approach to evaluate and optimize mineral projects, utilizing methodologies such as DCF-ROR for optimization, ordinary Kriging for ore reserve estimation, and multi-level optimization including strategic planning, pit optimization, life of mine optimization, and production schedule optimization. Finally, the content is fully aligned with internationally recognized standards such as the VALMIN and JORC codes, ensuring compliance with industry best practices and guidelines.

Table of Contents:

Introduction.- Mineral Resources and Ore Reserves Estimation.- Feasibility Studies.- Valuation of Mineral Projects.- Mine Planning and Open Pit Optimization.- Life of Mine Optimization of Surface Mining.- Production Schedule Optimization.- Optimization of Underground Mine Planning and Scheduling.- Conclusion.